Electronic
Music Production
Yr2
Jan 5th – may 2015
Project
Management
Simon Adair
Log
for Project management
|
Date: |
Details: |
Outcome and next
steps: |
|
5th
Jan
|
Finalised
event brief and had a copy sent to my project partner to be
verified.
|
Partner
liked the idea and we discussed the idea further online, further
developing the idea of Data-bending as a central idea.
|
|
12th
Jan
|
Recorded
more sampling to be used in project and have started working on an
art portfolio
|
|
|
21st
Jan
|
Tried
to arrange studio time at the WEC with little success.
|
Problem
was the password access I had a talk with Stuart at the WEC about
it and had the problem fixed
|
|
27th
Jan
|
Talked
with partner about getting studio time. I had been online to book
and found very few slots
|
I
had an idea, I usually stick around on Monday evening after my
regular Production session so I made arrangements with my partner
to meet me up at the WEC and I would 'hold onto' the room I would
be using. I had checked the timetable for Monday and only two
studios were booked so two would be free. However I am going to
try and book time anyway so I don't get kicked out the room.
|
|
2nd
Feb
|
Had
a session with my colleague at the WEC. We had lots of hardware to
work with, mainly analogue synthesis. The main goal was to get
some of our own patches recorded and bounced to use as samples.
|
|
|
11th
February
|
Had
meeting about venue
|
We
came to the decision that the Loco was our best bet for reasons of
budget, crowd and convenience.
|
|
19th
February
|
Half
term.
|
I
booked studio 2 at the WEC and continued to work on sample pack
for live event. Lee wasn't available due to work commitments.
|
|
23rd
Feb
|
Work
on sampling and Meeting in afternoon to brainstorm budget, music
style and venue.
|
Our
best bet for venue is still bar loco. The music style will have to
be more 'gentle' to prevent the punters from defecting to the bar.
Our budget is roughly £200 for hardware, promotion and transport.
Our projected revenue as a first time with this line up will be to
break even. Although not having to pay for venue fee and PA will
put us a little ahead. We still need to schedule a tech-spec of
the venue and build a rapport with the ownership.
|
|
2nd
march
|
More
work on sampling.
|
I've
got a very comprehensive library now and will be bouncing the
entire library to WAV. Lee will get duplicate copies of the WAVs
to work with.
|
|
9th
march
|
Late
session in studio
|
Some
loops have been recorded using the Aira gear. I'm getting worried
things aren't getting done quick enough so the pace will have to
be picked up. There are lots of photography for project Management
but the photos are of poor quality and most of them are for synth
patching. However I was pointed in the right direction and have
printed off patch sheets for the Pro 1.
|
|
13th
march
|
Inventory
of Equipment and resources
|
The
Budget has been increased and we have more hardware now. This
Includes; Synth, Bass Guitar, Pedal units, Audio interface and
many analogue samples.
|
|
17th
march
|
Rehearsal
|
First
proper rehearsal with hardware: System 1 and Aira drum machine.
|
|
24th
march
|
Rehearsal
and recording
|
Myself
and lee need way more practice for rehearsal and I'm becoming
concerned because of the Easter holidays approaching. However
today's session was extremely productive. I had brought in the
System 1 and clocked it to the Aira drum machine and linked up
both the MS20 and the Pro 1. We recorded Lizard People for my
album.
|
|
2th
April
|
Made
arrangements with the Loco
|
I
made correspondence with Bar Loco to garner information on the
venue and criteria for performing there. I got info on how the
open mic works and some info on tech. Although I requested they
didn't have a tech-spec although I informed them of what equipment
we would be using.
|
|
3rd-19th
April
|
Easter
period.
|
Easter
has gotten in the way of rehearsal as studios haven't been
available and Lee has been bogged down by a large dissertation. I
myself have had to concentrate on other modules and especially my
album.
|
|
20th
April
|
Studio
work on album.
|
I
had to do a lot of monitoring today for the tracks on my album.
This has been very time consuming as mastering Industrial Power
Noise Is a tricky thing to do and takes a degree of concentration.
The tracks have to be ready for this Friday. I Had messaged lee
that I could do some rehearsing in the afternoon but he was
unavailable due to his dissertation.
|
|
21st
April
|
Lee
granted permission to use Lizard People on my album.
|
I
have had to make some decisions on the actual date of our live
performance, regretfully I have had to keep rolling it back due to
other commitments, Lee's dissertation (a very large body of
research). So now may is looking more likely for any kind of live
work. I also really would wish more rehearsal time but this is
very hard to come by at the moment
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|